The 5 Biggest Design Challenges in Tunnel Projects
Tunnel design is a high-stakes balancing act. Discover the top five challenges consultants face, from limited early data to reacting fast on site, and how to turn them into opportunities.
1 Oct 2025



Tunnels
TBM
Monitoring
Tunnel projects are among the most complex undertakings in civil engineering, and that’s exactly where platforms like Proqio make a difference, simplifying how designers and consultants work with data and respond to risks. They bring together multiple stakeholders, tight deadlines, and high technical and financial risks. From the very first design sketches to the final stages of construction, engineers and consultants face a constant battle against limited data, ground uncertainty, and the need to make critical decisions fast.
Unlike other infrastructure works, tunnels operate in environments where visibility is low and the margin for error is even lower. Early design assumptions must later withstand the realities of construction, while asset owners, contractors, and consultants each bring different priorities to the table. Add to this the need for strong governance, independent records, and rapid responses to site conditions, and it’s easy to see why tunnel projects demand exceptional precision.
In this article, we highlight the five biggest challenges that designers and consultants face in tunnel projects today, challenges that, if not properly addressed, can lead to delays, higher costs, and increased risks.
Challenge #1: Designing with Limited Early Data
At the earliest stages of a tunnel project, designers are asked to produce accurate, risk-informed designs with very little project-specific information. Geotechnical conditions are uncertain, historical records are often incomplete, and site-specific behaviour data may not yet be available. As a result, the work carried out during the design stages, which have a significant impact on the success of the project, is often based on mere assumptions.
This lack of reliable early data increases the risk of unforeseen ground conditions, design changes, and cost overruns. It also puts pressure on engineers to balance safety, performance, and cost without a complete picture of the site.

Challenge #2: Balancing Client and Contractor Priorities
Tunnel projects bring together stakeholders with very different goals. For clients, the focus is often on long-term performance, safety, and value for money. Contractors, on the other hand, must deliver competitive bids, keep costs under control, and manage tight schedules.
Designers and consultants sit in the middle of these competing priorities. In the tender stage, they are asked to create designs that are cost-efficient yet technically robust enough to help win the contract. Once the project is awarded, those same designs must be refined into detailed, buildable solutions that align with site conditions.
Striking the right balance between client expectations and contractor needs is one of the most consistent challenges in tunnel design, and a common source of tension as projects progress.
Challenge #3: Managing Assumptions and Uncertainty
In the early stages of a tunnel project, designers and contractors sometimes have to work with assumptions about ground conditions, construction risks, and how the structure will perform. These assumptions often arise because information is incomplete or released gradually during the bidding process.
The challenge comes later: as more data becomes available, those assumptions must be revisited, tested, and refined. If they are not carefully tracked, or if they remain scattered across disconnected documents, critical details can be lost. This creates a risk of clashes, errors, or costly rework during construction.
Uncertainty is part of every underground project, but without structured ways to manage it, it can quickly escalate into delays, disputes, and rising costs.

Challenge #4: Maintaining Independent Records During Construction
During construction, consultants play a critical role in protecting the client’s interests and ensuring that works are delivered according to the design intent. To do this, they must maintain reliable, independent records of monitoring results, progress checks, quality observations, and technical comments, separate from contractor reporting.
The challenge is not only to keep this independence, but also to compare consultant data with contractor submissions such as shift reports, quality records, and progress updates. Without a structured way to collect and organize this information, there is a risk of missing key issues, working reactively, or spending excessive time consolidating evidence.
If discrepancies are detected too late, the result can be costly corrections, program delays, and a weaker client position in claims or disputes.
Challenge #5: Responding Quickly to Site Changes
For designers working with contractors during construction, one of the biggest challenges is reacting quickly to unexpected conditions on site. Discrepancies often appear between the original design and what is encountered during excavation or construction. Ground behavior may differ from initial assumptions, or monitoring data may reveal risks that require immediate attention.
In these cases, design updates must be issued under significant time pressure to avoid downtime. Without rapid and full access to construction and monitoring data, teams risk working reactively, providing partial solutions, or overlooking critical issues.
The consequences are serious: delays in the construction schedule, lost productivity, costly rework, and increased project costs.
Turning Challenges into Opportunities
These five challenges show the pressure that tunnel projects place on designers and consultants, from the very first sketches through to the final stages of construction. Each stage demands precision, independence, and the ability to act fast.
To explore practical ways of overcoming these issues, download our free guide “Practical Solutions for Designers and Consultants in Tunnel Projects" or get in touch to see how Proqio supports designers and consultants in real tunnel projects.

Tunnel projects are among the most complex undertakings in civil engineering, and that’s exactly where platforms like Proqio make a difference, simplifying how designers and consultants work with data and respond to risks. They bring together multiple stakeholders, tight deadlines, and high technical and financial risks. From the very first design sketches to the final stages of construction, engineers and consultants face a constant battle against limited data, ground uncertainty, and the need to make critical decisions fast.
Unlike other infrastructure works, tunnels operate in environments where visibility is low and the margin for error is even lower. Early design assumptions must later withstand the realities of construction, while asset owners, contractors, and consultants each bring different priorities to the table. Add to this the need for strong governance, independent records, and rapid responses to site conditions, and it’s easy to see why tunnel projects demand exceptional precision.
In this article, we highlight the five biggest challenges that designers and consultants face in tunnel projects today, challenges that, if not properly addressed, can lead to delays, higher costs, and increased risks.
Challenge #1: Designing with Limited Early Data
At the earliest stages of a tunnel project, designers are asked to produce accurate, risk-informed designs with very little project-specific information. Geotechnical conditions are uncertain, historical records are often incomplete, and site-specific behaviour data may not yet be available. As a result, the work carried out during the design stages, which have a significant impact on the success of the project, is often based on mere assumptions.
This lack of reliable early data increases the risk of unforeseen ground conditions, design changes, and cost overruns. It also puts pressure on engineers to balance safety, performance, and cost without a complete picture of the site.

Challenge #2: Balancing Client and Contractor Priorities
Tunnel projects bring together stakeholders with very different goals. For clients, the focus is often on long-term performance, safety, and value for money. Contractors, on the other hand, must deliver competitive bids, keep costs under control, and manage tight schedules.
Designers and consultants sit in the middle of these competing priorities. In the tender stage, they are asked to create designs that are cost-efficient yet technically robust enough to help win the contract. Once the project is awarded, those same designs must be refined into detailed, buildable solutions that align with site conditions.
Striking the right balance between client expectations and contractor needs is one of the most consistent challenges in tunnel design, and a common source of tension as projects progress.
Challenge #3: Managing Assumptions and Uncertainty
In the early stages of a tunnel project, designers and contractors sometimes have to work with assumptions about ground conditions, construction risks, and how the structure will perform. These assumptions often arise because information is incomplete or released gradually during the bidding process.
The challenge comes later: as more data becomes available, those assumptions must be revisited, tested, and refined. If they are not carefully tracked, or if they remain scattered across disconnected documents, critical details can be lost. This creates a risk of clashes, errors, or costly rework during construction.
Uncertainty is part of every underground project, but without structured ways to manage it, it can quickly escalate into delays, disputes, and rising costs.

Challenge #4: Maintaining Independent Records During Construction
During construction, consultants play a critical role in protecting the client’s interests and ensuring that works are delivered according to the design intent. To do this, they must maintain reliable, independent records of monitoring results, progress checks, quality observations, and technical comments, separate from contractor reporting.
The challenge is not only to keep this independence, but also to compare consultant data with contractor submissions such as shift reports, quality records, and progress updates. Without a structured way to collect and organize this information, there is a risk of missing key issues, working reactively, or spending excessive time consolidating evidence.
If discrepancies are detected too late, the result can be costly corrections, program delays, and a weaker client position in claims or disputes.
Challenge #5: Responding Quickly to Site Changes
For designers working with contractors during construction, one of the biggest challenges is reacting quickly to unexpected conditions on site. Discrepancies often appear between the original design and what is encountered during excavation or construction. Ground behavior may differ from initial assumptions, or monitoring data may reveal risks that require immediate attention.
In these cases, design updates must be issued under significant time pressure to avoid downtime. Without rapid and full access to construction and monitoring data, teams risk working reactively, providing partial solutions, or overlooking critical issues.
The consequences are serious: delays in the construction schedule, lost productivity, costly rework, and increased project costs.
Turning Challenges into Opportunities
These five challenges show the pressure that tunnel projects place on designers and consultants, from the very first sketches through to the final stages of construction. Each stage demands precision, independence, and the ability to act fast.
To explore practical ways of overcoming these issues, download our free guide “Practical Solutions for Designers and Consultants in Tunnel Projects" or get in touch to see how Proqio supports designers and consultants in real tunnel projects.

Tunnel projects are among the most complex undertakings in civil engineering, and that’s exactly where platforms like Proqio make a difference, simplifying how designers and consultants work with data and respond to risks. They bring together multiple stakeholders, tight deadlines, and high technical and financial risks. From the very first design sketches to the final stages of construction, engineers and consultants face a constant battle against limited data, ground uncertainty, and the need to make critical decisions fast.
Unlike other infrastructure works, tunnels operate in environments where visibility is low and the margin for error is even lower. Early design assumptions must later withstand the realities of construction, while asset owners, contractors, and consultants each bring different priorities to the table. Add to this the need for strong governance, independent records, and rapid responses to site conditions, and it’s easy to see why tunnel projects demand exceptional precision.
In this article, we highlight the five biggest challenges that designers and consultants face in tunnel projects today, challenges that, if not properly addressed, can lead to delays, higher costs, and increased risks.
Challenge #1: Designing with Limited Early Data
At the earliest stages of a tunnel project, designers are asked to produce accurate, risk-informed designs with very little project-specific information. Geotechnical conditions are uncertain, historical records are often incomplete, and site-specific behaviour data may not yet be available. As a result, the work carried out during the design stages, which have a significant impact on the success of the project, is often based on mere assumptions.
This lack of reliable early data increases the risk of unforeseen ground conditions, design changes, and cost overruns. It also puts pressure on engineers to balance safety, performance, and cost without a complete picture of the site.

Challenge #2: Balancing Client and Contractor Priorities
Tunnel projects bring together stakeholders with very different goals. For clients, the focus is often on long-term performance, safety, and value for money. Contractors, on the other hand, must deliver competitive bids, keep costs under control, and manage tight schedules.
Designers and consultants sit in the middle of these competing priorities. In the tender stage, they are asked to create designs that are cost-efficient yet technically robust enough to help win the contract. Once the project is awarded, those same designs must be refined into detailed, buildable solutions that align with site conditions.
Striking the right balance between client expectations and contractor needs is one of the most consistent challenges in tunnel design, and a common source of tension as projects progress.
Challenge #3: Managing Assumptions and Uncertainty
In the early stages of a tunnel project, designers and contractors sometimes have to work with assumptions about ground conditions, construction risks, and how the structure will perform. These assumptions often arise because information is incomplete or released gradually during the bidding process.
The challenge comes later: as more data becomes available, those assumptions must be revisited, tested, and refined. If they are not carefully tracked, or if they remain scattered across disconnected documents, critical details can be lost. This creates a risk of clashes, errors, or costly rework during construction.
Uncertainty is part of every underground project, but without structured ways to manage it, it can quickly escalate into delays, disputes, and rising costs.

Challenge #4: Maintaining Independent Records During Construction
During construction, consultants play a critical role in protecting the client’s interests and ensuring that works are delivered according to the design intent. To do this, they must maintain reliable, independent records of monitoring results, progress checks, quality observations, and technical comments, separate from contractor reporting.
The challenge is not only to keep this independence, but also to compare consultant data with contractor submissions such as shift reports, quality records, and progress updates. Without a structured way to collect and organize this information, there is a risk of missing key issues, working reactively, or spending excessive time consolidating evidence.
If discrepancies are detected too late, the result can be costly corrections, program delays, and a weaker client position in claims or disputes.
Challenge #5: Responding Quickly to Site Changes
For designers working with contractors during construction, one of the biggest challenges is reacting quickly to unexpected conditions on site. Discrepancies often appear between the original design and what is encountered during excavation or construction. Ground behavior may differ from initial assumptions, or monitoring data may reveal risks that require immediate attention.
In these cases, design updates must be issued under significant time pressure to avoid downtime. Without rapid and full access to construction and monitoring data, teams risk working reactively, providing partial solutions, or overlooking critical issues.
The consequences are serious: delays in the construction schedule, lost productivity, costly rework, and increased project costs.
Turning Challenges into Opportunities
These five challenges show the pressure that tunnel projects place on designers and consultants, from the very first sketches through to the final stages of construction. Each stage demands precision, independence, and the ability to act fast.
To explore practical ways of overcoming these issues, download our free guide “Practical Solutions for Designers and Consultants in Tunnel Projects" or get in touch to see how Proqio supports designers and consultants in real tunnel projects.

Recommended from Proqio

Innovation
Smarter Infrastructure Monitoring with InSAR: A Conversation with Geofem
10 Sept 2025

Innovation
Smarter Infrastructure Monitoring with InSAR: A Conversation with Geofem
10 Sept 2025

Innovation
Smarter Infrastructure Monitoring with InSAR: A Conversation with Geofem
10 Sept 2025

Proqio
Proqio Enters the Canadian Market: Elevating Tunnel Monitoring with Real-Time Insights
8 Sept 2025

Proqio
Proqio Enters the Canadian Market: Elevating Tunnel Monitoring with Real-Time Insights
8 Sept 2025

Proqio
Proqio Enters the Canadian Market: Elevating Tunnel Monitoring with Real-Time Insights
8 Sept 2025

Integration
Proqio Connects with DeltaIoT to Expand GNSS Monitoring Capabilities
12 Aug 2025

Integration
Proqio Connects with DeltaIoT to Expand GNSS Monitoring Capabilities
12 Aug 2025

Integration
Proqio Connects with DeltaIoT to Expand GNSS Monitoring Capabilities
12 Aug 2025